
2011-2020 
6-23-11 Max’s inside home for 5 months 
7-4-11 Max’s First outdoor enclosure 
9-12-11 5×10 addition with double-entry system 
9-12-11 Max! 
9-12-11 New shelf 
10-29-11 Inside enclosure 
11-7-11 Window access/box to outside enclosure 
11-7-11 Max inspecting his window box 
11-7-11 Relaxing after dinner 
11-7-11 Checking out table 
11-13-11 Donated dog igloo by neighbor 
12-17-11 Winter-proofing enclosure 
12-17-11 Enjoying his shelf 
12-25-11 A glimpse into his 6×10 
4-14-12 Enclosure overhaul 
10-7-12 extra shelf addition 
10-7-12 Max inspection 
10-28-12 2nd shelf addition 
10-28-12 A sliding door is added to box to lock Max out while cleaning. Safety precautions. 
5-2-13 Max-size litter pan added 
8-17-13 New Pet Barn 
8-17-13 Max with Snoopy 
8-18-13 10×15 addition 
8-18-13 Max inspecting his new run 
8-19-13 More space 
4-27-14 Current access for Max – too small 
4-27-14 Cut a new piece of wood with larger opening 
5-3-14 Max & his chicken leg 
6-29-14 New shelving for addition 
11-10-14 Max sharpening his claws 
9-27-15 Max with a view 
4-24-16 Old shelving 
4-24-16 New shelving 
4-24-16 New outside shelving 
4-24-16 More new shelving 
4-30-16 Current 6×10 area 
4-30-16 New handmade table 
4-30-16 Max 
5-29-16 2nd corner shelf 
5-29-16 Max inspection 
9-10-16 2nd shelf destroyed 
9-10-16 3rd new corner shelf 
9-10-16 Max enjoying the day 
4-10-17 Rusted Entry Gate 
4-10-17 Gate replaced and protected with a wood urine guard 
4-15-17 Rust from urine in the 10×15 section 
4-15-17 Rust removed, primed and painted 
4-15-17 Fresh mulch put down with plexiglass urine guard 
4-15-17 Max enjoying the mulch 
4-17-17 Max igloo placed in corner to prevent marking 
5-21-17 15×60 Panels installed 
6-20-17 Braces & wire roofing installed 
7-9-17 More rust in the 6×10 enclosure 
7-9-17 Wire on side and bottom removed. 
7-10-17 New wire, metal de-rusted, primed and painted. Plexi guard installed. 
7-10-17 All bottom wire removed 
7-10-17 Ground layered with lime 
7-10-17 Top soil installed 
7-10-17 Fresh mulch added 
4-22-18 New bench for Max & I 
7-29-18 New pallet for scratching 
11-19-18 Pole Barn addition 
1-27-19 Max bearing the rain in his cozy corner 
4-15-19 All straw removed 
4-15-19 Max enjoying the scents 
5-13-19 Fake Boulder 
5-29-19 Bamboo Fencing 
6-9-19 Wire roofing under barn removed 
6-19-19 Cleaner look without the extra wire roofing 
6-2-19 Our summer look 
6-22-19 Corner Cubby before 
6-22-19 Corner Cubby fencing installed 
6-23-19 Corner Cubby completed 
6-23-19 Max enjoying it 
11-17-19 Ramps installed for Cat Walk 
11-17-19 Cat Walk installed 
11-17-19 Max enjoying it 
11-19-19 Dead tree 
11-19-19 Dead tree repurposed 
11-19-19 Max hiding 
5-20-20 Long ramp to Cat Loft 
5-20-20 Cat Loft addition 
5-20-20 Max enjoying it 
11-14-20 Double entry system supersized 
12-6-20 Mandatory Perimeter Fencing installed 
12-13-20 East gate completed 
12-13-20 Main gate personalized
